Skip to main content

Project Cargo.

Thiên Hà coordinates transport plans for oversized, heavy, and project equipment with specific route, handling, and delivery requirements.

Hàng siêu trường siêu trọng trên phương tiện vận chuyển dự án

PROJECT CARGO

More than moving one large piece of cargo.

Each project shipment requires a dedicated plan for dimensions, weight, route, handling equipment, and delivery points. Thiên Hà coordinates related steps so the journey is prepared before cargo begins to move.

PROJECT CARGO CAPABILITIES

From survey to transport and site delivery.

Xếp dỡ thiết bị công nghiệp bằng cẩu tại cảng

HEAVY & OVERSIZED CARGO

Oversized and heavy cargo.

Coordinate transport plans for equipment and components that exceed standard transport dimensions or weight.

SURVEY

Route survey.

Review transport routes, restrictions, and access conditions related to the shipment journey.

ENGINEERING / PLANNING

Transport plan development.

Coordinate vehicle, weight, support equipment, and execution sequence requirements.

HANDLING

Handling coordination.

Prepare lifting, loading, unloading, and transfer steps suited to the equipment.

SITE

Site delivery.

Coordinate schedule and receipt conditions at the delivery or project site.

ENGINEERED JOURNEY

Every step prepared before cargo begins to move.

For project cargo, transport is built from actual shipment, route, and delivery conditions — not just from the vehicle.

  • 01

    PLAN

    Define requirements

  • 02

    SURVEY

    Route survey

  • 03

    ENGINEER

    Develop plan

  • 04

    HANDLE

    Handling

  • 05

    TRANSPORT

    Transport

  • 06

    DELIVER

    Arrive at project site

PROJECT CARGO OPTIONS

Choose a plan based on project characteristics.

HEAVY &
OVERSIZED

HEAVY CARGO

Oversized and heavy cargo

For equipment, components, or cargo that exceed standard transport size and weight limits.

  • 01

    Industrial equipment

  • 02

    Large-scale components

  • 03

    Cargo with special weight requirements

MULTIMODAL
PROJECT

MULTIMODAL TRANSPORT

Multimodal transport

Coordinate multiple transport modes when the project journey requires road, port, and transshipment connections.

  • 01

    Multiple leg connections

  • 02

    Transshipment coordination

  • 03

    Schedule coordination

SITE
DELIVERY

FINAL DELIVERY

Site delivery

Coordinate the final leg per site access conditions and project receipt plans.

  • 01

    Access conditions

  • 02

    Delivery schedule

  • 03

    Site coordination

PROJECT CONDITIONS

Every project starts from different conditions.

Cargo dimensions, weight, route, and site conditions determine how the transport plan is built.

CARGO

Dimensions & weight

Define shipment characteristics and related transport requirements.

ROUTE

Route

Review the journey, restrictions, and access capability.

HANDLING

Handling requirements

Define lifting, transfer, or support equipment steps.

SITE

Site conditions

Coordinate timing and delivery conditions at the project location.

PROJECT DELIVERY

The journey is complete only when cargo reaches the right position.

From port, warehouse, or transshipment point, Thiên Hà coordinates the final leg so equipment is delivered per the project receipt plan.

01

SITE ACCESS

Access conditions

02

DELIVERY WINDOW

Delivery window

03

SITE DELIVERY

Site handover

NEED TO DISCUSS PROJECT CARGO?

Speak with Thiên Hà about your shipment, transport route, and project delivery requirements.